County versus city jurisdiction
Brevard County is unusual in how tightly unincorporated neighborhoods interlock with city limits. A home off Wickham Road may be inside Melbourne, inside Suntree's unincorporated pocket, or inside Viera's community district — and each answers to a different permitting counter. The fastest way to know is to look up the parcel and read the taxing authority before you call anyone.
For unincorporated addresses, Brevard County's Planning and Development department handles building permits and code questions. Inside city limits, the city's own building department is the authority, and its rules on things like exterior color palettes in historic districts can be stricter than the county's.
What actually needs a permit
Repainting an existing wall, ceiling, cabinet or garage floor is maintenance, not construction. What can require a permit is the repair underneath: replacing large sections of stucco or lath, cutting into structure to correct water intrusion, or altering openings. If a paint job uncovers rot or failed substrate, that is the moment to check.
We handle this the same way on every job. Before work begins, our written scope states what is coating work and what is repair, so you can see immediately whether anything needs a call to your building department. If a repair crosses into permitted territory, we tell you before we start rather than mid-project.
HOA approvals are separate from permits
Most repaint delays in Brevard have nothing to do with government. They come from HOA architectural review. Communities in Viera, Suntree, Baytree, Bayside Lakes and Heritage Isle typically require a submitted color scheme from an approved palette, and review can take two to four weeks.
Pull your color approval before you lock a start date. We can supply brand, product line and color codes for your submission so the paperwork matches exactly what goes on the wall.
Common questions
- Do I need a permit to paint the exterior of my house in Brevard County?
- For a standard repaint of an existing home, no. Permits apply to structural or substrate work — extensive stucco replacement, altered openings, or exterior work on a historic structure. Confirm with the county for unincorporated addresses, or your city building department inside city limits.
- Does stucco repair need a permit in Brevard County?
- Cosmetic crack repair and patching normally do not. Replacing large areas of stucco or the lath behind it can, especially when structural repair is involved. We flag that in the written scope before work starts.
- How long does HOA color approval take in Viera or Suntree?
- Plan on two to four weeks. Submitting exact brand, product line and color codes up front is the single biggest thing that keeps a submission from being kicked back.
Related services
Where this applies
Have a question about your own project?
Pro Touch Painting is licensed and insured and writes every estimate as an itemized document. Call or email and we will answer straight, whether or not you hire us.
